Go to content

Hurtiglenker

  • Contact us
  • Site map
  • På norsk

Search

Hovedmeny

  • Our business
  • Career
  • Investor Relations
  • News
  • About Grenland Group

You are here:

  • Frontpage
  • Our business
  • Products
  • Multi Intervention Tower®

Our business

  • Grenland Group Solutions
  • Grenland Group Offshore Partner
  • Grenland Group Fabrication
  • Products
    • DD 7500, GG4, GG6 and GG8
    • MinoxTM Deoxygenation System
    • Multi Intervention Tower®
    • Heave-X® - Heave Eliminator
    • PetroFlame® burner booms
    • BOP underhull guiding system
    • FEColumns
  • AsIs 3D Laser Scanning
  • Electrical & Automation
  • A - Z index

Well intervention handling systems

Grenland Group can facilitate various well intervention operations based on our in-house knowledge and patented handling solutions such as our Integrated Lifting Frame and Heave-X®.

Both solutions can be integrated in a Multi Intervention Tower®, along with other related equipment such as skidding systems, moonpool systems and personnel access systems. The Multi Intervention Tower® can also be scaled down to provide regular subsea construction services. We can also provide add-on intervention handling systems for existing support structures.

Multi Intervention Tower®

Module Handling Tower - Tower, Skid System and Moonpool

Grenland Group designs and builds module handling towers for subsea well-intervention operations.

The design for the equipment is based on safety for personnel and environment, and for simple and efficient handling of different subsea modules. In addition, the equipment gives easy access for inspection, maintenance and replacement of parts.

Main Features:

  • Hydraulic power pack is mounted in a standard 20’ ISO container with interface connections for hydraulic and power supply outside the container
  • All internal power cable, signal cable and piping are included on the equipment
  • Arrangement for local or remote control from control cabin
  • Time-effective mobilisation/demobilization of winches
  • Heave elimination
  • Easy vessel interface

View product sheet in PDF format

General:

The tower is equipped with guide rails for the cursor system, and sheaves for guide wire. Furthermore, the cursor wire and main lift wire are integrated into the tower structure.

The cursor system consists of a framework, running on guides, which are mounted along the internal structure in front of tower, and down into the moonpool. The cursor winch is placed on a dedicated platform mounted in front and near the top of the tower. The guide wire arms are easy to adjust to suit most modules.

The moonpool hatch is divided into three sections, the centre section which contains the deck rails, and 2 side hatches. The control cabin is located adjacent to the side of the tower structure or can be integrated into the support vessel.

Heave-X® - Heave Eliminator

Typical Design

The typical tower system has the following design features:

  • Designed to handle modules 5m x 5m x 6m and weighing up to 30 tonnes
  • Interfaces with a moonpool of 7.5m x 7.5m
  • Can be operated in up to 3.5 m significant wave (vessel dependent)
  • Includes active heave compensation on main lift wire

 

Grenland Group Solutions Grenland Group Offshore Partner Grenland Group Fabrication

© Grenland Group ASA 2009   E-mail: | Switchboard: +47 335 08580 | Telefax: +47 35 56 03 51